What does the post-pouring belt mean?
What does the post-pouring belt mean?

1, what does the post-pouring belt mean? Post-pouring belt is a kind of concrete belt set at the corresponding position of foundation slab, wall and beam in accordance with the requirements of design or construction specification in order to prevent harmful cracks that may be caused by uneven shrinkage or uneven settlement of cast-in-place reinforced concrete structure during construction.

2. If the building settlement is poor, it can be solved by post-pouring belt. However, after the construction, it is necessary to temporarily disconnect the two parts of the belt, and after the construction is completed, the two parts will be combined to form a whole. Because in the design process, considering the different erection forces of the two stages, it needs to be carried out separately.

How long can the post-pouring belt be poured?

1. It usually takes 28 days to pour the post-cast strip during the concrete solidification. If the main structure of the house is completed or the concrete on both sides has been formed, it will take at least 60 days. Of course, the pouring of post-cast strip should also change according to the weather and temperature at that time.

2. The lien width of post-cast strip is generally 700- 1000mm, and commonly used ones are 800mm, 1000mm and1200 mm.. The joint forms of post-cast strip are straight joint, step joint, notch joint and X-joint. The steel bars in the post-cast strip should be completely disconnected and then overlapped, and additional steel bars should not be cut off.

Construction technology of post-pouring belt

Construction process of post-cast strip: removing and cleaning sundries in post-cast strip → derusting, shaping, binding or repair welding of steel bars → formwork support → supervision and acceptance → pouring concrete.

Construction method

1. Dismantle and clean up the sundries in the post-cast strip. In the field construction, in order to pursue the accuracy and impression of the retained position of the post-cast strip, there are steel wire mesh and wood square on both sides of the post-cast strip. At present, all the wood squares should be removed during construction, and the redundant steel wire mesh should also be removed. The cement slurry and excess concrete in the post-pouring zone of beam and slab should be chiseled clean and straight, and the original concrete waste should be completely cleaned before entering the next working procedure.

2. Derusting and straightening of steel bars: Derusting of steel bars includes derusting all steel bars and derusting the steel bars in the foundation with a long wire brush; After rust removal, the steel rust in the post-cast strip shall be washed clean with water.

3. After derusting, correct the bending of steel bar. The reinforced bars in the beam slab should be overlapped and repaired according to the design requirements, and the reinforced bars that need to be supplemented should be supplemented.

4. After the acceptance of the supervision unit, the foundation shall be cast immediately after derusting and cleaning, and the floor post-cast strip shall be washed before concrete pouring to prevent the secondary corrosion of steel bars.