How to operate the hospital decoration?
Hospital decoration process 1, hospital decoration consultation: understanding hospital needs. Hospital organization, corporate image, process relationship between departments, estimated growth rate in the next three years, project budget and progress, etc. Hospital types, management concepts, understanding of geographical environment, dynamic analysis, product positioning, and understanding of appeal targets.
Hospital decoration process 2, on-site measurement: on-site measurement of moving lines, beams and columns, sitting direction, vision, etc. And the measurement of detailed space size.
Hospital decoration process 3. Finalization of plane sketch: according to the needs of site space and hospital, draw the plane layout and define the main space and sub-space. At this stage, the designer has almost determined the direction of the overall design style.
Hospital decoration process 4. Proposal brief: For the floor plan, the designer provides the design concept of materials similar to the hospital and explains the design style positioning.
Hospital decoration process 5. Design contract signing: once the designer submits the outline of the proposal, he will get a preliminary understanding. We will sign the design contract first to protect the rights and obligations of both parties. During this period, if it is necessary to modify the local requirements of the hospital, the designer can make two or three modifications until he is satisfied.
Hospital decoration process 6. Design finalization: After many times of communication between the designer and the hospital in aesthetics, practicality, building materials, construction methods and budget, the designer finally finalized the design.
Hospital decoration process 7. Design details Decoration hospital renderings: The designer began to draw hospital decoration renderings according to the final layout, elevation, section and top view of each department.
Hospital decoration process 8. Project contract signing: it is usually suggested that the construction team should be selected by the design company, and there will be less disputes on the attribution of responsibility in the future. So after the design case is completed, we will sign a project contract with the hospital.
Hospital decoration process 9. Start work: after signing the contract, find a good day to start work. Designers and engineers will be responsible for the whole process and control the progress and quality according to standard operating procedures. In the course of the project or at the interface of each type of work, the details of the branch will be checked, such as whether rivets are used to strengthen the structural fixing force of the old and new interfaces, and whether the depth and width of the wardrobe tube meet the drawings.
Hospital decoration process 10, house inspection after completion: after completion and cleaning, the director, designer and engineer will meet with the preliminary inspection, and then invite the hospital for acceptance.
The above is how to operate the hospital decoration brought by Bian Xiao. The whole content of the detailed hospital decoration process.