Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Information Department Annual Work Summary
Information Department Annual Work Summary

In daily study, work or life, everyone has probably dealt with letters. Letters are a communication tool used by people to express their feelings. In order to make it easier and more convenient for you to write letters, here are 6 annual work summaries of the Information Department that I have compiled for you. You are welcome to read them. I hope you will like them. Summary of the annual work of the Information Department 1

With the strong support of the leaders of the hospital and the assistance and cooperation of other departments, the Information Department has carried out a series of work and achieved good results. The work is now summarized As follows:

1. Information system is an important support for hospital management, and ensuring the normal and efficient operation of the information system is an important responsibility of the information department. To this end, the Information Department always focuses on maintaining the safe and stable operation of the hospital information system with the electronic medical record system as the core, promptly responds to fault maintenance of various departments, strives to reduce the incidence of faults, lowers the fault level and duration, and effectively improves the efficiency of employees and Patient satisfaction with our department’s services.

2. Timely complete the interface work between the medical insurance, new rural cooperative medical system and our hospital's HIS system, so that special patients and inpatients can settle through the HIS system in real time, which greatly facilitates the timely payment of medical compensation fees for patients. , which has effectively reduced the medical burden for the people and smoothed the channels for medical treatment.

3. Completed PACS system research, procurement, online and other work: In order to speed up the informatization construction process of our hospital, in accordance with the instructions of the hospital leaders and the needs of the clinical and imaging departments, through the information department, radiology department After more than two months of joint efforts by department and clinical staff and China United Engineers, our hospital’s Picture Archiving & Communication System (PACS) has been fully online. Clinicians only need to click the mouse to The patient's imaging information and examination report materials can be obtained at the first time, which facilitates doctors to quickly diagnose the condition and provides more convenience for clinical diagnosis and treatment. At present, our hospital has realized the online collection, transmission, storage and browsing of imaging data from CR, DSA, CT, digital gastrointestinal, color ultrasound, gastroscopy, colonoscopy, bronchoscopy, pathology and other equipment.

4. Procurement of gatekeepers for internal and external network isolation equipment: In order to further strengthen the security of the interface between our hospital’s information system and the Health and Family Planning Commission’s HQMS system, while ensuring real-time and safe reporting of data, the procurement was carried out through bidding in June this year One NetShen SecSIS 3600 model gatekeeper ensures that our hospital’s information system can maximize the security level of its network transmission while exchanging data with external parties.

5. Procurement of a set of clinical pathways (10 diseases): Based on the spirit of the Ministry of Health’s "Clinical Pathway Management Guiding Principles (Trial)" and "Clinical Pathway Management Pilot Work Plan" and provincial clinical priorities Specialty inspections need to be carried out on December 3 in conjunction with the Procurement Office, Audit Department, and Equipment Department to purchase a set of clinical pathways.

6. Complete the upgrade and renewal of the online version of the anti-virus software used in the hospital’s intranet to ensure the security of the intranet.

7. Conducted continuous maintenance and management of the hospital’s computer and printer equipment software and hardware. The hospital currently has more than 200 computers and more than 100 printers and copiers. Our department continues to learn technology and strive to reduce the operating costs of the equipment.

8. There are nearly 300 monitoring equipment in the hospital. Personnel are regularly arranged to inspect the monitoring equipment, and problems found during the inspection are dealt with in a timely manner to ensure the stable operation of the monitoring equipment in the hospital.

9. Due to the unstable power system of our hospital, summer and winter are the peak periods of power outages every year. From time to time, switches, optical transceivers and other equipment are damaged due to power outages. In May this year, the Information Department applied for leadership. It supports equipping switches on all floors of the hospital with UPS. Although it does not cost much, it greatly reduces the damage rate of network equipment caused by power outages.

10. Strive to do a good job in online direct reporting. Complete online direct reporting tasks such as national, provincial and municipal monthly, quarterly, and annual reports in a timely and prepared manner, and assist other departments in the hospital to complete the collection of various data

Summarize and submit reports and receive inspections by superiors.

11. The maintenance of charging items and the recovery, binding, cataloging, shelving, and random inspection of medical records in the medical record room are as follows:

There are about 26,000 charging items maintained and compared throughout the year ( Municipal platform, medical insurance, rural cooperative medical care and his new projects)

Recycled, bound, catalogued, and put on the shelf approximately 126,000 medical records throughout the year

Randomly checked and reviewed approximately 3,500 medical records

Complete and submit various reports to national, provincial, municipal and other departments in a timely manner.

12. The number of people studying abroad in the Information Department throughout the year: 15.

13. Existing problems

(1) Internal network security needs to be further improved.

(2) There is no real-time off-site backup of database data, which may cause data loss.

It needs to be further resolved.

(3) There is no fire protection in the computer room and it needs to be solved as soon as possible.

(4) There are too few opportunities to study abroad. You should learn more about the advanced information management experience of other hospitals.

In the future work, the Information Department should strive to raise awareness, enhance its own business level, provide technical support to other functional departments, clinical departments, and medical technology departments, and contribute to the development of the hospital. Annual Work Summary of the Information Department 2

This year, with the strong support of the hospital leaders and the joint efforts of all the staff of the Information Center, the information construction of our hospital has developed steadily. Runs smoothly. With the assistance and cooperation of various departments, a series of work has been carried out and good results have been achieved. The work situation of this year is now reported as follows:

1. Basic situation

At present Our hospital has basically formed a preliminary digital hospital. The network covers every department in the hospital, with more than 400 computers running at the same time, supporting all aspects of management. The information system*** has 25 subsystems, mainly including outpatient doctor workstation, resident doctor workstation, inpatient nurse workstation, electronic medical record system, medical technology management system, inspection system, medical image management system, physical examination system, medical record system, and Chinese and Western medicine library Pharmacy management system, inpatient and outpatient charging system, etc. Each subsystem is divided into various modules. There are more than 300 modules in total, and about 327 reports are in use. Supports the management of all aspects including patient visits to the hospital, medicines, equipment, supplies, and health care management. There are 4 external interfaces for connecting with the New Rural Cooperative Medical System, Social Security, Finance, and Health and Family Planning Commission systems.

In terms of hardware

1. The computer room is located on the 4th floor of the outpatient clinic (the computer room is 56 square meters, with anti-static flooring on the ground and equipped with two constant humidity and constant temperature air conditioners to provide good ventilation and heat dissipation for the server) environment, configure the UPS system to provide uninterruptible power supply configuration for the main computer room, configure gas fire extinguishers, etc.), lay Gigabit optical fiber with the backbone network between each floor of the outpatient building and inpatient building, lay 100M Category 5e network cables at network points, and use Category 6a Class lines (such as laboratory, radiology). The old hospital is connected to the computer room through leased telecommunications optical fiber dedicated lines.

2. Our hospital’s network architecture uses VLAN technology to divide the physical network connected by switches into multiple logical subnets. It improves the transmission efficiency of the network and also increases the security of the network.

3. Core equipment in use: 4 servers, 2 storage units, and 1 core switch. Common equipment: 429 desktop computer terminals, 188 printers of various types, about 80 telephones, two self-service inquiry terminals, and two large screens (one full color, one monochrome).

2. Work situation

1. The stable operation of the server is the most basic guarantee, so the Information Department always takes the safe operation of the server as its main work content. The server is carefully checked every day according to the maintenance system established by the department, mainly to check whether the files are damaged, CPU and memory resource usage, whether the client login and access to the database are normal, etc., and do a good job of data transfer and backup. Ensures the safe and efficient operation of the server.

2. Handle various problems that arise during the use of information system workstations in various departments, and complete some inquiries and the production of statistical reports. According to the work log, more than 4,000 cases of various sizes were handled throughout the year, and 92 reports were added or modified. Handle daily hardware failures, including maintenance of computers, network equipment, printing equipment, telephone equipment and other equipment, and conduct regular inspections to ensure that the normal business of the hospital is not affected.

3. Strengthen system security and network security management. Conduct regular inspections, formulate hospital-wide intranet IP allocation and management measures, and strictly monitor the use of external storage and other media.

4. Timely complete the maintenance and update of the interface between the medical insurance, new rural cooperative medical system and our hospital's HIS system, so that patients can make real-time settlement reports directly through the HIS system, which greatly facilitates patients' timely cashing. Medical reimbursement costs.

5. Strive to do a good job in online direct reporting. Timely complete the online direct reporting tasks assigned by superior departments, such as monthly medical record homepage, patient daily report, medical service price system monitoring and other data reporting, and provide system query reports and query data according to the needs of each department.

6. Carry out information system operation training, set up a special computer training room, and organize training for new employees and system module upgrades every year.

7. Office equipment procurement, according to the "Computer and Related Consumables Procurement Management System", 51 computers, 21 printers and various office consumables totaling 647,000 were purchased throughout the year.

8. Enable convenient WIFI hotspots in the hospital, covering 20 points including the outpatient hall, infusion hall and various medical waiting halls.

3. Various assistance tasks

1. Assist the Finance Department to conduct inventory and entry of the pharmacy every quarter;

2. Assist the hospital publicity department to conduct outpatient department inspections Maintenance of screens;

3. Assist the party office in completing photography and video recording of various activities;

4. Responsible for the use of audio and projection for various conferences and lectures in the multi-functional hall ;

5. Assist the Party Office to create a mass line special website for the hospital intranet;

6. Assist each department in the maintenance and upgrade of data reporting software;

7. Assist the medical department in conducting remote consultations and remote lectures.

IV. Shortcomings

1. Because the department undertakes a large amount of daily maintenance work, and some problems are difficult to solve, or require assistance from manufacturers, resulting in problems that are not handled in time or solved There are situations such as the time is too long.

2. Insufficient coordination and lax management.

3. Further improve professional knowledge.

V. Next year’s work plan

To further improve the hospital’s information management level and further accelerate the pace of digital hospital construction, combined with the actual situation of the hospital, the 20xx work plan is now as follows:

1. Cooperate with the party office, strive to improve the functions of our hospital’s website, enrich the website content, use various emerging technologies to enhance our hospital’s external publicity platform, and increase our hospital’s social visibility

2. Do a good job Routine maintenance of information system hardware and software. Conduct regular inspections and maintenance, and keep records of equipment maintenance to ensure the normal and safe operation of the system and the normal development of clinical business.

3. According to the development needs of the hospital, systems such as surgical anesthesia clinical information and medical examination training will be launched online.

4. Strengthen learning and training, and participate in informatization-related training and conferences as much as possible to broaden your horizons and learn skills. Information Section Annual Work Summary Part 3

20xx is the year when the 18th National Congress of the Communist Party of China was successfully held, and it is also a critical year for our county to accelerate its transformation and leapfrog development. Over the past year, under the strong leadership of the county party committee and county government and the strong support of superior departments, and with the full cooperation of departments at all levels, the County Government Information Center has achieved good results in various tasks.

1. Work in the past year

1. Operation and maintenance of government portal website. The government portal is a platform for government information disclosure and a window to display the government's image. It is the top priority of e-government work. The main columns of the website include "Government Affairs Disclosure", "News Updates", "Into Huguan", "Government-Citizen Interaction", "Leadership Topics", "Investment Attraction", "Special Tourism" and dozens of other columns. The content of the columns closely follows The actual economic and social development of the county is updated or enriched in a timely manner. The website undergoes performance evaluation and public evaluation by the Municipal Government Information Center at the end of each year. It also accepts inspections and assessments from superiors from time to time. It mainly evaluates three aspects: content enrichment, functional perfection and technical support. In recent years, our county government’s website performance evaluation scores have generally been at the top, and it has won advanced honors many times.

2. Edit and submit government information. Government information submission is an important task for the government to report information and serve leadership decision-making. We adhere to the principle of "timely, accurate and comprehensive", closely focus on the important work arrangements of the county party committee and county government and the central work of the government office, constantly expand the information field, improve the information network, optimize the information carrier, improve the information quality, and provide scientific decision-making and guidance for leaders The work provides effective information services, and the information submission work has achieved good results. Up to now, *** has compiled and published more than 300 issues of "Huguan Government Information", and the number of adoptions ranks among the top in the city. The government information work has been awarded the city's advanced title year after year.

3. Mayor’s mailbox, social conditions and public opinion processing procedures and number of transactions. The interaction between government and citizens is related to people's livelihood demands and the harmony and stability of the county. It is an important task that leaders pay close attention to. Since the beginning of this year, we have strictly followed a series of procedures for each mayor's mailbox, consultation and complaints, social conditions and public opinion, etc., and finally transferred them to the organizer and reported them one by one, so that every piece of information can be responded to. . Up to now, *** has handled more than 90 inquiries and complaints through the mayor’s mailbox, and more than 50 issues regarding social conditions and public opinion. At the same time, more than 1,000 pieces of information were proactively uploaded to the Huguan government’s website and the municipal government’s website platform.

4. E-government network operation and maintenance. E-government network operation and maintenance is the technical support to ensure the normal operation of government networks. Since the launch of the government affairs network, this work has always been a shortcoming. First, due to the weak professional and technical strength of our county's information center; second, due to insufficient financial resources in our county, there are still arrears for project construction, and operation and maintenance funds have not been implemented, resulting in equipment software The seller's technical operation and maintenance is not in place. Since this year, the Government Information Center has tried every means to hire a part-time network professional engineer from the city to be responsible for the technical operation and maintenance of the hardware equipment of our county's government network. The hardware system has been ensured, and the current network operation and maintenance is generally normal.

2. Main existing problems

1. Insufficient understanding of grassroots departments.

Some units and leaders have insufficient understanding of the importance of government information disclosure. They have not realized the role of government information disclosure in promoting administration according to law, serving the people's production, life, and economic and social activities. They have not understood the "Regulations" Insufficient, inadequate implementation, conservative thinking and outdated concepts in adapting to the Regulations. Mainly manifested in the lagging action and slow progress when implementing the "Regulations"; unclear classification when clearing and filling in public information, and irregular website columns and information names; some units still only release some leadership and organizational information and some work dynamics, information The depth and intensity of disclosure are still not enough, the system construction needs to be improved, and funding investment is insufficient; very few units believe that they are not the subject of government information disclosure, basic information has not been sorted out, and government information disclosure work has not been effectively carried out.

2. The infrastructure is relatively backward. This is due to the conditions of our county. Some towns and units have insufficient investment in hardware facilities and do not meet the requirements. Some information staff still need to improve their computer knowledge and operating abilities. These problems have greatly affected the progress of government information disclosure work.

3. Insufficient supervision and guidance. As the information disclosure work organization of our county government, although the Information Center has established a comprehensive coordination mechanism, due to the small number of full-time personnel responsible for information disclosure, it seems to be unable to cope with the more than 100 information disclosure units in the county, and the intensity of in-depth supervision and guidance is insufficient. Not enough. Annual Work Summary of the Information Department Part 4

With the strong support of the hospital leaders, the work in 20xx was carried out in an orderly manner. The various tasks completed during the year are now reported as follows.

1. Construction and improvement of hospital network information.

1. On the basis of basically completing the construction of the HIS system and electronic medical record system last year, we further solved system problems and improved the system, so that the system is in a stable working condition, which brings great convenience to clinical work. .

2. Completed the internal network design of the new outpatient complex building and provided technical support for its construction, which provided good technical support for the successful completion of the network construction of the new outpatient complex building.

3. The construction of physical isolation between the hospital’s internal and external networks has been completed. The successful debugging and installation of the firewall has ensured the maximum security of the hospital’s internal network.

4. The replacement of the core switch in the computer room was successfully completed, which greatly improved the network operation speed and took a big step forward in the standardized construction of the hospital network.

5. The home page of medical records, outpatient and emergency visits, admissions and discharges can be automatically uploaded to the Health Department. The completion of this work marks a new level in the hospital's informatization construction.

6. The official launch of the hospital’s new website has brought a great publicity platform to the hospital’s publicity work.

7. The use of "medical card" brings great convenience to doctors' work (for example, pediatrics), and at the same time lays a solid foundation for the hospital to develop various functions of medical card and simplify the medical treatment process. Base.

8. During the relocation process of the hospital's new outpatient complex building, the relocation, installation and debugging of more than 100 computers were completed.

9. Completed the construction of triage, guidance, queuing and other systems to provide strong system support for simplifying the medical treatment process.

The staff in the computer room are serious and responsible, and have put a lot of effort into ensuring the normal operation of the software. They are on the phone or in person every day to deal with problems that arise, including various problems caused by unskilled operations. All kinds of unexpected errors, and overcoming many difficulties such as aging computers, some computers and printers that have expired the warranty period, and insufficient spare machines, are able to repair them by themselves, saving a lot of money for the hospital.

Existing problems: The construction of the hospital information system is still in the preliminary stage and will cause many problems. Because the HIS, PACS and other systems have not yet been completed, the doctor's medical record homepage is not filled in the standard, and the medical record room coder encounters business difficulties, etc., the precious 4 points were deducted in the "Three Good and One Satisfactory" activity inspection. The hospital's overall network is poorly constructed and poorly equipped. When problems occur, it is difficult to find the fault point in a timely manner and needs further sorting and improvement.

2. Statistics Office

As the number of patients in the hospital increases year by year, the only staff member in the statistics office has completed various statistical work required by the hospital under a relatively heavy workload. Any errors occur.

3. Medical Records Room

As the number of medical records increases year by year, the staff of the Medical Records Room arrange their work reasonably and complete the recovery, binding and archiving of more than 21,117 medical records, which is higher than that in 20xx 1,627 more copies per year. Since there are no smokers in the undergraduate department, it can meet the regulations and requirements of the anti-smoking work.

In short, this year is the year of continued construction of the hospital information system. It is destined to be a busy and difficult year. However, with the full support of the hospital leaders, the Information Department has successfully completed the construction of the new system. , bringing the hospital's informatization construction to a new level.

Information Department Annual Work Summary 5

This year’s information technology work centered on the province’s data concentration work, implemented the information center network and computer room renovation project, and improved the systems for computer system security management and equipment maintenance, providing Provide technical support for the development of various businesses of rural credit cooperatives.

1. Reasonably allocate resources and complete the provincial central network interconnection work.

According to the provincial federation’s comprehensive business system construction plan, the city’s rural credit cooperatives’ online work is scheduled to be completed in the second half of the year. According to the work arrangement of the provincial federation’s computer center, our city’s information center must complete the work with the provincial federation’s computer center before June 10. Interconnection work of provincial centers. Under the circumstances of tight time and heavy tasks, our department formulated a special work plan, divided labor reasonably, and completed the work deployment of the provincial center ahead of schedule.

First of all, the department’s technical staff worked together to formulate a plan for the transformation of the information center network equipment based on the principle of “saving resources and meeting standards”.

⑴. Purchase two CISCO3550 switches to achieve dual-machine hot backup of network lines.

⑵. Purchase CISCO3662 routing module to connect the main line (telecom optical fiber).

⑶. Instead of purchasing a new CISCO3550 router, use the resources of the original CISCO2610 router (used for credit management) to purchase the corresponding modules to connect the backup line (China Unicom fiber optic).

Secondly, we promptly submitted the above engineering transformation plan to the Provincial Information Center and the Science and Technology Department for approval. After being approved by the Science and Technology Department, our department worked overtime and started working overtime in mid-May with the equipment and lines in place. The connection with the provincial information center has been completed, providing network guarantee for the next step of data collection.

2. Implement the central computer room renovation project to ensure the safe operation of the central computer room.

In the first half of last year, our city’s rural credit cooperatives realized data centralization. The central work of our Information Technology Department was transferred from the maintenance of computer systems at business outlets to the operation and maintenance of computer systems in central computer rooms. The central computer room Safe and efficient operation is the prerequisite for the business development of rural credit cooperatives in our city. Since this year, in accordance with the work requirements of the Provincial Science and Technology Department, the computer room of our city's information center must comply with the standards set by the Science and Technology Department in terms of lightning protection and fire protection. After careful research, our department selected the most cost-effective solution among several sets of engineering plans. The construction was completed in April and passed the acceptance of the automatic fire protection system of the Municipal Fire Brigade and the acceptance of the lightning protection system of the Municipal Lightning Protection Test Center. .

3. Improve the computer security management system to ensure the safe operation of computer systems.

With the promotion of computer applications in the business and management fields of credit unions, the security management of computer systems is particularly important. In order to prevent risks and ensure the safe and efficient operation of computer systems, according to the relevant regulations of the public security department and the provincial federation , our department formulated the "Computer Security Management Measures" in a timely manner, adhering to prevention first, safety first, acting in accordance with the law, and comprehensive management in daily computer system security management.

First of all, the Associated Press established a computer information system security protection leading group headed by the director and attended by heads of various functional departments, which is responsible for supervising, inspecting, and guiding the computer security protection work of business outlets.

Secondly, the position setting of the computer system management and operating personnel of the Associated Press Network Information Center and business outlets was clarified, and detailed job responsibilities were formulated to ensure that safety responsibilities are assigned to each person.

Under the premise of organizational implementation and clear responsibilities, we have formulated specific operating methods based on business needs for various operational behaviors of the information center and business outlets, from aspects of hardware management, password management, data management, etc. Standardize operating behavior and eliminate safety hazards.

4. Organize operator business training in a timely manner to improve business skills.

In accordance with the computer operator training system and business needs, we issued the "Computer Operation Skills Questionnaire for Business Outlet Employees", and based on this form, we formulated this year's training plan and compiled and distributed relevant training materials. Two periods of operator training were organized in an effort to improve operators' business skills.

5. Working with colleagues, the integrated business was successfully launched and all businesses were carried out normally.

According to the provincial association’s online work plan and requirements, the online work tasks will be completed within 18 days from August 10 to August 27. Under the circumstances of tight time and heavy tasks, we actively cooperated with the finance, credit and other departments to formulate online work plans, implement them at all levels, coordinate with each other, and clarify the division of labor. The first is to prepare a plan for replacing computer hardware equipment online in a timely manner. The equipment was purchased and a training room was built within four days. The second is to compile comprehensive business online training materials and organize comprehensive training for business staff. Five training sessions were held in eight days, with 210 participants. It laid a good foundation for the development of online business. Third, it only took four days for all hardware facilities to be installed in time. The fourth is to work closely with the financial department to verify the transplanted account data, clean up and standardize the accounts, and ensure the smooth launch. The fifth is to cooperate with the provincial central government to develop intermediate business based on the actual situation and successfully complete the continuous adjustment.

Sixth, the system business testing before going online was implemented in place, and problems discovered during the testing were coordinated and dealt with in a timely manner, which provided a guarantee for a successful one-time go-live. Under the leadership of the Associated Press' online leading group, after working hard for 18 days and nights, the online work was finally successfully completed, ensuring the normal development of all businesses.

6. Promptly coordinate and resolve problems encountered after the new business system is launched.

After the new comprehensive business system was launched, new requirements were put forward for business operations and there were still some imperfections in the new business system, which should be solved in a timely manner with relevant departments. First, the daily work requirements of the new business system were compiled. The second is to promptly summarize the existing problems after the new business system goes online, and actively work with scientific and technical personnel to study and solve them, or contact the provincial center to ask for help in solving them, so that we can solve every problem when we encounter it. The third is to complete the organizational separation of Tuqiao Branch and Puxi Branch.

7. Perform normal maintenance of computer equipment and networks.

After the comprehensive business went online, there was a new demand for computer equipment. Based on the principle of "saving resources and complying with standards", the equipment at the grassroots outlets was adjusted and configured, and daily maintenance was strengthened to ensure Computer equipment and networks are secure and functioning properly. At the same time, our department conscientiously maintained the software and hardware of the central computer room and business outlets, and performed specific business operations such as agency national taxation and local taxation, and successfully completed various tasks.

20xx work focus.

First, strengthen business learning and research, improve professional skills, and ensure the safe operation of computer systems.

The second is to complete the operation of issuing bank cards according to the requirements of the Provincial Association for issuance of bank cards.

The third is to plan and organize business system knowledge training to ensure the normal development of various businesses. Information Department Annual Work Summary Part 6

Looking back on some of the work I have done in the past three years, during these three years I have worked hard and continuously enhanced my work ability and technical level. Put your passion into your work. Strive to do every job well and perform well in all aspects, which has been recognized and praised by everyone. In the past three years, together with my colleagues in the department, under the guidance of the hospital leaders and department directors, I have completed every task in the work on time and with quality, grown through constant summaries, and constantly improved myself. The work of the year is summarized as follows:

1. Ideology:

Take the patient as the center, proceed from the interests of the hospital, and implement your own outlook on life and values ??in your ordinary position. Reposition and combine practical actions at work to serve patients and clinical front-line services. For their own positions, study relevant hospital documents, reports and materials, deeply understand their spiritual essence, and put theoretical knowledge into work.

2. Work:

I am mainly engaged in network and security management and hospital electronic information system maintenance. I have always been conscientious and meticulous in my work and resolutely obeyed the instructions given by the hospital leaders. , clarify responsibilities, and complete tasks scientifically, reasonably and effectively, while increasing daily maintenance work and improving the ability to respond quickly to emergencies.

In terms of equipment management, we must carefully complete accounting, acceptance, and maintenance registration to achieve reasonable optimization of resources, conduct regular inspections, do a good job in maintenance, improve comprehensive utilization, and ensure long-term operation.

In terms of network management, the configuration files in internal and external network switches and routers are backed up in real time.

In terms of strengthening safety management, under the leadership of the supervisor, the computer room safety management system is regularly investigated for potential safety hazards, and rectification suggestions are put forward, which effectively strengthens the safety management of department equipment and adheres to the principle of giving priority to prevention and combining prevention and control. Indirectly increase safety awareness and self-protection capabilities. It also accumulated valuable experience for handling subsequent equipment failures.

The above is the main work I have been engaged in for the past three years, but there are many other tasks I have engaged in or been involved in: I am also responsible for hospital safety monitoring information. In various tasks I am engaged in, They can all perform their duties conscientiously, consider comprehensively and comprehensively, and complete various tasks assigned by leaders. As a technical worker, I will meet new challenges with a hundredfold enthusiasm in my future work, continue to improve and strengthen my professional skills.

In the past three years, with the guidance and help of the leaders, although some achievements have been made, there are also shortcomings. My deficiencies in theoretical knowledge and self-emotion management need to be improved, and I need to continue to work hard in depth and breadth. In order to do a better job, I set work and study goals, strengthen personal technical theoretical study, so as to improve my work level, adapt to the requirements of work under the new situation, use my strengths and avoid weaknesses, and meet new challenges with a full mental state. Learn from each other's strengths, exchange good work experience with other comrades, and strive to reach a new level in the new year.

Looking at the past three years, the ups and downs of work are always looming in front of my eyes, but I have to face the reality. Not only must I be able to bury my head and work selflessly when I work, but I must also be able to look back when I look back. Every time, every detail of the work is checked and verified, and the work experience is summarized and analyzed, so that we can go further and sum up experience and learn lessons in order to better do future work.