I have more say in this. I am now working on information software in the tire factory to tell you about the situation of the molding workshop:
1. The molding workshop is the entire tire production process. Among them, the workshop with the best environment and the highest wages has a constant temperature of more than 20 degrees all year round because this is a process requirement.
2. The working hours are long and a bit tiring. This is when you first started working as an apprentice. Later, when you become a host, someone will help you. Now the equipment is relatively modern, and there is nothing you thought. It’s so tiring, but if you work 12 hours a day, it will be harder; but the salary is high; generally, those who work 8 hours of work can earn more than 4,000 to 5,000, and those who work 12 hours of work generally earn more than 7,000
3. Regarding accidents, it is usually caused by pressing the hand on the forming drum. This is usually caused by improper operation or illegal operation. As long as the normal operating procedures are followed, on-site production is very safe.