How to decorate the new house?
There are four processes in decoration, namely, water and electricity, bricklaying, carpentry and painting. The four processes are interrelated and influence each other, and standardized process standards are the guarantee of quality.

(1) Property related procedures

The decoration company will bring a copy of the business license and relevant design drawings, and go to the property company with you to go through the relevant formalities. Remember to bring enough cash, first of all, you need to pay the decoration deposit, the general amount is 2000 yuan, and the owner and the decoration company pay 50% each. However, it is recommended that all of them be paid by the owner, because if the decoration company pays, there is basically no return. Pay the property management fee, buy water and electricity, and the decoration company needs to apply for the construction personnel pass.

(2) Site design disclosure:

The so-called design disclosure means that on the first day of construction, the designer takes a full set of design drawings to the construction site and makes disclosure to the project supervisor. Project supervision is generally experienced in the field. In the process of design disclosure, some design omissions can often be found, and designers will be required to make design modifications. Workers carry out construction in strict accordance with the design drawings, so once design errors and omissions are found, designers must immediately modify the design, and after the design modification, the budget should be adjusted accordingly.

(3) hydropower positioning:

The hydropower part generally needs to be reformed. The basic principles of hydropower transformation are as follows: the waterway behind the water meter is completely transformed and the pipeline is re-laid; Generally, the original circuit is used as much as possible, and only local modifications or additions are made.

Because the cost of hydropower transformation is generally settled in advance and truthfully immediately after completion, it is easy to be ensnared carelessly, and the actual settlement amount greatly exceeds the amount received in advance.

(4) find the level

Bricklayers must first find a good level when entering the site. Now, laser levels is generally used to directly play the horizontal line on the wall, and then play the ink line. Without laser levels, we can only use the old method of injecting water into transparent plastic pipes to find the level.

(5) smash the wall to build a wall

If there are old walls to be demolished and new walls to be built, workers will carry out the construction according to the design drawings.

Designers should be familiar with the building structure, and be careful when removing or moving the wall: the load-bearing wall cannot be removed; The beam can't be smashed; In the case of no beam below, generally do not build a new wall directly on the ground, even if you have to build a new wall, you should use lightweight bricks; Don't remove the bathroom wall easily to prevent the original waterproof structure from being damaged.

(6) Handling at the door

The height of the standard door leaf is generally 2 meters, and the highest is about 2.2 meters. If the doorway exceeds this height, it must be treated.

Many decoration companies use gypsum board to treat the keel, and then scrape it with putty and paint it. After a long time, cracks will inevitably appear at the joint between gypsum board and brick wall.

The correct construction technology should be pouring cement lintel now, adding at least 3 8 mm steel bars inside the lintel, filling it with bricks after the lintel is installed, and then batch cement mortar.

(7) flue treatment

Because there are many residents in high-rise buildings and the flue temperature is particularly high, a layer of cement mortar should be added after the flue is hung, otherwise the tiles will fall off easily in the future.

(8) Wall plastering

The newly built wall must be watered before plastering, the red brick must be thoroughly watered, and the light brick should be moderately watered. Pay attention to ensure that the wall is flat when approving the ash.

There are four processes in decoration, namely, water and electricity, bricklaying, carpentry and painting. The four processes are interrelated and influence each other, and standardized process standards are the guarantee of quality.

(1) Property related procedures

The decoration company will bring a copy of the business license and relevant design drawings, and go to the property company with you to go through the relevant formalities. Remember to bring enough cash, first of all, you need to pay the decoration deposit, the general amount is 2000 yuan, and the owner and the decoration company pay 50% each. However, it is recommended that all of them be paid by the owner, because if the decoration company pays, there is basically no return. Pay the property management fee, buy water and electricity, and the decoration company needs to apply for the construction personnel pass.

(2) Site design disclosure:

The so-called design disclosure means that on the first day of construction, the designer takes a full set of design drawings to the construction site and makes disclosure to the project supervisor. Project supervision is generally experienced in the field. In the process of design disclosure, some design omissions can often be found, and designers will be required to make design modifications. Workers carry out construction in strict accordance with the design drawings, so once design errors and omissions are found, designers must immediately modify the design, and after the design modification, the budget should be adjusted accordingly.

(3) hydropower positioning:

The hydropower part generally needs to be reformed. The basic principles of hydropower transformation are as follows: the waterway behind the water meter is completely transformed and the pipeline is re-laid; Generally, the original circuit is used as much as possible, and only local modifications or additions are made.

Because the cost of hydropower transformation is generally settled in advance and truthfully immediately after completion, it is easy to be ensnared carelessly, and the actual settlement amount greatly exceeds the amount received in advance.

(4) find the level

Bricklayers must first find a good level when entering the site. Now, laser levels is generally used to directly play the horizontal line on the wall, and then play the ink line. Without laser levels, we can only use the old method of injecting water into transparent plastic pipes to find the level.

(5) smash the wall to build a wall

If there are old walls to be demolished and new walls to be built, workers will carry out the construction according to the design drawings.

Designers should be familiar with the building structure, and be careful when removing or moving the wall: the load-bearing wall cannot be removed; The beam can't be smashed; In the case of no beam below, generally do not build a new wall directly on the ground, even if you have to build a new wall, you should use lightweight bricks; Don't remove the bathroom wall easily to prevent the original waterproof structure from being damaged.

(6) Handling at the door

The height of the standard door leaf is generally 2 meters, and the highest is about 2.2 meters. If the doorway exceeds this height, it must be treated.

Many decoration companies use gypsum board to treat the keel, and then scrape it with putty and paint it. After a long time, cracks will inevitably appear at the joint between gypsum board and brick wall.

The correct construction technology should be pouring cement lintel now, adding at least 3 8 mm steel bars inside the lintel, filling it with bricks after the lintel is installed, and then batch cement mortar.

(7) flue treatment

Because there are many residents in high-rise buildings and the flue temperature is particularly high, a layer of cement mortar should be added after the flue is hung, otherwise the tiles will fall off easily in the future.

(8) Wall plastering

The newly built wall must be watered before plastering, the red brick must be thoroughly watered, and the light brick should be moderately watered. Pay attention to ensure that the wall is flat when approving the ash.