When the cable is laid parallel to the insulation layer, the distance should not be less than 200mm; when the cable is laid crosswise, the distance between the cable and the uninsulated hot surface should not be less than1m.. When each cable is paid out and at the end of each cable laying, it must enter the recheck procedure, that is, check the model and specification, the name of the beginning end and the name of the end of the cable, and make records.
Extended data
Cable pay-off instructions:
1, measured with a shaking table (500V) before cable laying, and the insulation resistance of the cable is greater than 1 megohm.
2. The pay-off table and every corner should be equipped with walkie-talkies to keep in touch at any time.
3. When handling the cable, the cable should not be loose and injured, and the cable reel should roll in the direction indicated by the arrow on the cable reel.
4, cable with artificial traction handling, handling personnel should stand on the same side of the cable. When handling cables, you must listen to unified orders, unified steps and even speed. No running.
Hownet-skills about measurement and lofting
Construction lofting method under the condition of hownet -RTK/ total station