Correct construction method of all-ceramic tile upper wall
There are three correct construction methods for all-ceramic tile upper wall, as follows:
1. The cement mortar on the wall of floor tile is not well pasted and easy to fall off. Therefore, when paving now, special tile glue is often used to paste. On the basis of traditional cement products, the ceramic tile adhesive products were improved and new polymer materials were added. In order to make the glue more stable and have stronger adhesion, the construction effect is much higher than that of cement mortar paving, but the indoor construction temperature must be kept above five degrees.
2. If you need background wall decoration, you can grind a groove on the back of the floor tile, insert copper wire and fix it with glue. Then fix the keel and the glue for paving. At the approximate position of the background wall, get a keel and cover it with multilayer boards. Above the back of the floor tile that needs to be put on the wall, hang it with copper wire to determine the general location of the shop. Now fix the copper wire embedded in the ceramic tile with screws, and spread the ceramic tile on the wall with glue.
3. Mix cement and mortar according to a certain proportion. Before paving the wall, it is necessary to wet the back of the tile with water to keep the surface of the tile dry. Evenly daub 20mm mud on the back of the floor tile, stick it on the wall, and then gently tap it with a rubber hammer to keep the wall flat and avoid the floor tile hollowing. However, due to the limited adhesion of cement mortar, this paving method is generally not recommended.
Matters needing attention of all-ceramic tile wall surface
1, no matter what method is used to paste the floor tile on the wall, in order to avoid rework or empty drum falling off, we need to evenly brush the glue on the back of the floor tile during construction.
2. Before the floor tile is put on the wall, the product needs to be soaked in clear water for about two times. Because the water absorption rate of floor tiles is not high, soaking water is to increase the adhesion between tiles and adhesives. If there is no soaking water, it may affect the construction effect of floor tiles.
When we buy tiles, it is not difficult to find that there is a layer of dust on the back of the tiles, so it needs to be cleaned before laying to keep the tiles clean. At the same time, it is necessary to thoroughly clean the paved wall and base, and clean up the dust and impurities on the wall.
The above is a detailed answer to the correct construction method and matters needing attention of all-ceramic tile wall. If you want to choose a full tile wall, then you must choose a high-tech construction master, so as to ensure the effect and service life of the tile wall. After all, not all tilers can make all-tile walls, and the technical requirements are very high.